Green electricity for Alberdingk Boley in Leuna.
In 2023, 2,280 photovoltaic modules were installed on an area of approx. 9,500 m² on the Alberdingk Boley Leuna site. The average annual yield is approx. 1.22 GWh. The plant is mainly used for self-supply. In the summer months, the balance can be fed into the public grid. The system's yield covers around 1/3 of the annual electricity requirement (basis 2023). The plant has been operating since 23.01.2024.